Production Execution
Jörg Thomas Dickersbach ()
Chapter 18 in Supply Chain Management with SAP APO¿, 2009, pp 367-372 from Springer
Abstract:
Abstract The conversion of planned orders into production orders is either triggered in SAP APO™ or in SAP ERP™. The conversion itself is in any case performed in SAP ERP™. To trigger the order conversion in SAP APO™, the two alternatives exits: Either with the transaction /SAPAPO/RRP7 or by setting the conversion indicator interactively for the individual order. Since the planned order and the production order are different objects in SAP ERP™, at the time of the order conversion the planned order is deleted in SAP ERP™ and a production order is created, including the BOM explosion, the explosion of the routing and a scheduling of each operation. If the conversion is triggered in SAP ERP™, simply the information about the deletion of the planned order and the creation of the production order is transferred, so that the scheduling of the planned order is lost, figure 18.1. Triggering the order conversion from SAP APO™ has the advantage that the connection between the deleted planned order and the new production order is considered, so that the production order is matched with the planned order and the operation dates are kept as shown in figure 18.2.
Date: 2009
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-540-92942-0_18
Ordering information: This item can be ordered from
http://www.springer.com/9783540929420
DOI: 10.1007/978-3-540-92942-0_18
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().