Modelling of Special Production Conditions
Jörg Thomas Dickersbach ()
Chapter 19 in Supply Chain Management with SAP APO¿, 2009, pp 373-383 from Springer
Abstract:
Abstract Alternative resources can be modelled either as alternative modes within one PPM resp. PDS or as alternative PPM resp. PDS. Since the selection of the plan takes place during production planning and not in scheduling, changes of the plan in scheduling are not supported by the scheduling applications but have to be performed interactively. Therefore alternative resources should be modelled as alternative modes if the resource selection is supposed to take place during scheduling. If alternative resources are modelled using alternative PPM resp. PDS (i.e. alternative production versions), the possibilities to change the resources in PP/DS are limited. The advantages and disadvantages resp. the properties of the different ways of modelling alternative resources – either using alternative modes within one plan or using alternative plans with only one mode – are listed in table 19.1.
Date: 2009
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-540-92942-0_19
Ordering information: This item can be ordered from
http://www.springer.com/9783540929420
DOI: 10.1007/978-3-540-92942-0_19
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().