Abstract:
Abstract The focus for this book is on operative procurement and not on strategic procurement. Strategic procurement selects the suppliers and negotiates the conditions and quantities. As a result a contract or a scheduling agreement might arise, and often there are costs of scale to be calculated. Operative procurement on the other hand is usually carried out by the planner and allows to choose between alternative suppliers. Since sometimes components do have a long lead time, their procurement has to be triggered quite early. Another question is triggering procurement based on a feasible plan to save storage costs or to have the components early enough in place, if the production must take place in advance.
Keywords: Supply Selection; Purchase Order; Master Data; Creation Date; Capacity Consumption (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-540-92942-0_20
Ordering information: This item can be ordered from
http://www.springer.com/9783540929420
DOI: 10.1007/978-3-540-92942-0_20
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().