The Planning Bullwhip: A Complex Dynamic Phenomenon in Hierarchical Systems

Philip Moscoso (), Jan Fransoo (), Dieter Fischer () and Toni Wäfler ()
Additional contact information
Philip Moscoso: Universidad de Navarra
Jan Fransoo: Eindhoven University of Technology
Dieter Fischer: University of Applied Sciences Northwestern Switzerland
Toni Wäfler: University of Applied Sciences Northwestern Switzerland

Chapter Chapter 8 in Behavioral Operations in Planning and Scheduling, 2010, pp 159-186 from Springer

Abstract: Abstract Instabilities in production planning and control have received considerable attention due to their negative impact on planning performance. However, extant research has been limited to theoretical (e.g. simulation) settings and has focused on specific methodologies (e.g. mathematical) to overcome instabilities. The objective of this chapter is to make two contributions to the theory development on production planning instabilities. First, it aims to make an empirical contribution through an in-depth case study, and second, it introduces a holistic framework that supports analysis of hierarchical planning systems and their potential instabilities. The in-depth case study is carried out on an industrial company that has difficulty to meet its customer deadlines and faces a significant order backlog. Planners of the company at different hierarchical levels and order chasers on the shop floor end up rescheduling open orders and updating lead times continuously when trying to meet deadlines, but eventually are not able to improve order fulfillment. Only after the introduction of an Advanced Planning System and centralization of planning decisions in a single department, on-time delivery was significantly improved and order back log drastically reduced. This case study allows studying of the underlying mechanism of such planning instabilities, with a particular focus on the impact on stability of human and organizational factors. On the basis of our findings and additional conceptual research we have then developed a framework constituted by six key planning systems attributes. By taking into consideration these factors, a firm can address the root causes of planning instabilities, rather than merely focus on its symptoms.

Keywords: Supply Chain; Lead Time; Planning System; Shop Floor; Planning Decision (search for similar items in EconPapers)
Date: 2010
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-13382-4_8

Ordering information: This item can be ordered from
http://www.springer.com/9783642133824

DOI: 10.1007/978-3-642-13382-4_8

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-23
Handle: RePEc:spr:sprchp:978-3-642-13382-4_8