Research on Engineering Variations Management of Urban Rail Transit Project in BT Mode – A Case of Shenzhen Metro Line 5
Xiao-chun Lu () and
Yi-lin Yin
Additional contact information
Xiao-chun Lu: Tianjin University
Yi-lin Yin: Tianjin University
Chapter Chapter 29 in Proceedings of 2012 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012), 2013, pp 281-289 from Springer
Abstract:
Abstract The financing way of projects in BT mode provides a feasible way for solving the contradiction problem of the municipal infrastructure construction funds. As the key risk factor of influencing BT project investment control, engineering variations controlling rights becomes the focus point between two parties of BT project. The paper explains the definition and category also demonstrates processing program of engineering variations, and further analyzes the reasons of variations, then takes Shenzhen metro line 5 as an example, which provides the theoretical basis and empirical analysis for engineering variations management in domestic urban rail transit project under BT mode.
Keywords: Urban rail transit project; BT mode; Engineering variations; Shenzhen Metro Line 5 (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-33012-4_29
Ordering information: This item can be ordered from
http://www.springer.com/9783642330124
DOI: 10.1007/978-3-642-33012-4_29
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().