Research on Railway Tunnel Construction Scheduling Technique Based on LSM
Liqiang Liu (),
Yisheng Liu (),
Yuanjie Tang () and
Qing Li ()
Additional contact information
Liqiang Liu: Beijing Jiaotong University
Yisheng Liu: Beijing Jiaotong University
Yuanjie Tang: Beijing Jiaotong University
Qing Li: Beijing Jiaotong University
Chapter Chapter 120 in LTLGB 2012, 2013, pp 895-903 from Springer
Abstract:
Abstract This paper analyzed the lack of schedule techniques for railway tunnel construction project. According to the linear project characteristics of the railway tunneling, attribute data standard for linear schedule of railway tunnel project have been studied. Moreover, an algorithm of railway tunnel project scheduling based on the Linear scheduling method is given. The algorithm is applied to an example of railway tunnel project to validate its effect.
Keywords: Railway construction; Tunnel project; Linear scheduling method; Scheduling technique (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-34651-4_120
Ordering information: This item can be ordered from
http://www.springer.com/9783642346514
DOI: 10.1007/978-3-642-34651-4_120
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().