Conduct the Project Retrospective
Aristide Aartsengel and
Selahattin Kurtoglu
Chapter 20 in Handbook on Continuous Improvement Transformation, 2013, pp 429-433 from Springer
Abstract:
Abstract This chapter is concerned with the reflection process that must be performed at the end of each significant milestone of the “PDSA Study” project phase and from which the project team reassembles to look back on what results were actually delivered at the milestone and to what extent the team has met the expectations for the considered milestone time period.
Keywords: Significant Milestone; Reflective Process; Project Team; Project Management Office (PMO); Enterprise Business (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-35901-9_20
Ordering information: This item can be ordered from
http://www.springer.com/9783642359019
DOI: 10.1007/978-3-642-35901-9_20
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().