“PDSA Do” Process Group
Aristide Aartsengel and
Selahattin Kurtoglu
Chapter 23 in Handbook on Continuous Improvement Transformation, 2013, pp 443-445 from Springer
Abstract:
Abstract Having carefully planned the “process improvement” project, the project manager, or the project team leader, and the project team are now ready to start the “PDSA Do” project phase. This phase is typically the longest phase of the project. It is the phase within which:
Keywords: Project Team Leader; Project Phase; Longer Phase; Project Management Plan; Establish Baseline Performance (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-35901-9_23
Ordering information: This item can be ordered from
http://www.springer.com/9783642359019
DOI: 10.1007/978-3-642-35901-9_23
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().