Generate Improvement Solutions
Aristide Aartsengel and
Selahattin Kurtoglu
Chapter 28 in Handbook on Continuous Improvement Transformation, 2013, pp 519-545 from Springer
Abstract:
Abstract Once assignable causes of variations have been identified, the associated cause-and-effect relationships explored, the identified assignable causes verified, and the process steps and tasks analyzed and summarized, the project team can begin with generating improvement solutions to guide positive change in the days and weeks ahead.
Keywords: Potential Solution; Project Team; Process Improvement; Process Outcome; Process Capability Index (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-35901-9_28
Ordering information: This item can be ordered from
http://www.springer.com/9783642359019
DOI: 10.1007/978-3-642-35901-9_28
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().