EconPapers    
Economics at your fingertips  
 

“PDSA Study” Process Group

Aristide Aartsengel and Selahattin Kurtoglu

Chapter 31 in Handbook on Continuous Improvement Transformation, 2013, pp 569-571 from Springer

Abstract: Abstract The purpose of this project phase is to sustain the deliverables built over the long term and build new knowledge through learning from the deliverables built in the “PDSA Do” project phase. It is not enough to determine that development and piloting of a prototype solution associated with an “improved process” resulted in improvement during particular pilots. As the project team builds knowledge about the new “improved process,” it will need to predict whether the change introduced by the new “improved process” will result in improvement under the diverse conditions it will face in the future.

Keywords: Project Phase; Diverse Conditions; Project Management Plan; Establish Baseline Performance; Process Improvement Plan (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-35901-9_31

Ordering information: This item can be ordered from
http://www.springer.com/9783642359019

DOI: 10.1007/978-3-642-35901-9_31

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-02
Handle: RePEc:spr:sprchp:978-3-642-35901-9_31