EconPapers    
Economics at your fingertips  
 

Create Work Breakdown Structure

Aristide Aartsengel and Selahattin Kurtoglu

Chapter 9 in Handbook on Continuous Improvement Transformation, 2013, pp 137-142 from Springer

Abstract: Abstract Identifying and breaking down the work to be done is the logical starting point in the entire planning process described in a previous chapter. This chapter is concerned with the project management process required to subdivide project deliverables and project work into smaller, more manageable components.

Keywords: Work Breakdown Structure; Entire Planning Process; Work Package Level; Architecture Design Tools; Account Control (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-35901-9_9

Ordering information: This item can be ordered from
http://www.springer.com/9783642359019

DOI: 10.1007/978-3-642-35901-9_9

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-06-16
Handle: RePEc:spr:sprchp:978-3-642-35901-9_9