Study of Cost-Time-Quality in Project Failure Risk Assessment Based on Monte Carlo Simulation
Xing Pan and
Zi-ling Xin ()
Additional contact information
Xing Pan: Beihang University
Zi-ling Xin: Beihang University
Chapter Chapter 144 in The 19th International Conference on Industrial Engineering and Engineering Management, 2013, pp 1361-1368 from Springer
Abstract:
Abstract In order to analyze project failure risk, the quality factor, added on the basis of cost-time joint risk assessment, are showed by the degree of deviation and expressed by 2-norm firstly. Secondly, considering the cost-time-quality factors jointly, the joint distribution model of cost-time based on the Monte Carlo model is established; meanwhile, the definition of project failure risk value is given. Last, an example is given based on Program Evaluation Review Technique (PERT) to simulate and analyse project failure risk through Monte Carlo Simulation (MCS).
Keywords: Cost-time-quality; Engineering project failure risk; Monte Carlo Simulation; The degree of deviation (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-38391-5_144
Ordering information: This item can be ordered from
http://www.springer.com/9783642383915
DOI: 10.1007/978-3-642-38391-5_144
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().