Research on the Project Hierarchy Scheduling for Domestic Automobile Industry
Peng Jia,
Qi Gao (),
Zai-ming Jia,
Hui Hou and
Yun Wang
Additional contact information
Peng Jia: Shandong University
Qi Gao: Shandong University
Zai-ming Jia: Qingdao Ocean Shipping Mariners College
Hui Hou: Shan Dong Shan Kuang Machinery Co., Ltd
Yun Wang: Shan Dong Shan Kuang Machinery Co., Ltd
Chapter Chapter 93 in The 19th International Conference on Industrial Engineering and Engineering Management, 2013, pp 883-890 from Springer
Abstract:
Abstract To improve the accuracy and performability of the vehicle R&D project scheduling of domestic automobile enterprises, a “4 + 1” hierarchy process system of domestic automobile enterprises is analyzed and summarized. A corresponding four levels scheduling management mode of the vehicle R&D project is presented based on the hierarchy process system, and a planning approach of three-month rolling schedule for the fourth level is proposed. Schedule minor adjustment and modification are given to solve the different extent change of rolling schedule.
Keywords: Hierarchy process; Hierarchy scheduling; Rolling schedule; Schedule minor adjustment; Schedule modification (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-38391-5_93
Ordering information: This item can be ordered from
http://www.springer.com/9783642383915
DOI: 10.1007/978-3-642-38391-5_93
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().