An Improved NSGA-II Algorithm for Resource-Constrained Discrete Time–Cost Tradeoff Problem
Hong Zha () and
Lian-ying Zhang
Additional contact information
Hong Zha: Tianjin University
Lian-ying Zhang: Tianjin University
Chapter Chapter 18 in The 19th International Conference on Industrial Engineering and Engineering Management, 2013, pp 159-166 from Springer
Abstract:
Abstract In this paper, a resource-constrained discrete time and cost tradeoff problem (RCDTCTP) is considered in knowledge intensive project, where the resources are mainly renewable resource, especially manpower. A multi-objective model for this problem is proposed. In order to illustrate the model, an improved non-dominated sorting genetic algorithm is introduced to solve the model with a numerical example. The results showed that a set of Pareto optimal scheduling alternatives can be obtained in given resource constraints, from which the project stakeholder can choose the preferred alternative.
Keywords: Improved NSGA-II; Multi-objective; Project scheduling; Time–cost tradeoff (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-38433-2_18
Ordering information: This item can be ordered from
http://www.springer.com/9783642384332
DOI: 10.1007/978-3-642-38433-2_18
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().