The Dynamic Progress of the Project Cost Optimization
Nan-nan Liu (),
Jian-ping Yang and
Qi Chen
Additional contact information
Nan-nan Liu: Xi’an University of Architecture and Technology
Jian-ping Yang: Xi’an University of Architecture and Technology
Qi Chen: Sinosteel Luoyang Institute of Refractories Research Co. Ltd
Chapter Chapter 21 in The 19th International Conference on Industrial Engineering and Engineering Management, 2013, pp 187-193 from Springer
Abstract:
Abstract In the view of the defects of the traditional model to optimize the exchange of time and cost, this article introduces the dynamic optimization by considering the time value to receive the schedule scheme, of which the present value is lowest. This essay establishes the model of dynamic time optimization based on the progress of the project payment, aims to realize the maximization of the net present value from the prospects of the contractor. The objective function including the cash inflow and outflow of the project implementation: owner pay, activity direct costs, project indirect expenses and so on.
Keywords: Fonts; Formatting; Margins; Cost (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-38433-2_21
Ordering information: This item can be ordered from
http://www.springer.com/9783642384332
DOI: 10.1007/978-3-642-38433-2_21
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().