Application of Work Study to the Improvement of PCB-Assembly Line
Xin-xin Han () and
Xu-hong Guo
Additional contact information
Xin-xin Han: Soochow University
Xu-hong Guo: Soochow University
A chapter in Proceedings of 2013 4th International Asia Conference on Industrial Engineering and Management Innovation (IEMI2013), 2014, pp 87-95 from Springer
Abstract:
Abstract The circuit board final assembly process is discussed as an application example in this study. In order to find the bottleneck stations where the production efficiency are low, work measurement is employed to determine operation time of every station. The paper applies analytical methods of process, operation and movement of work study to analyze the assembly line. Then the technique of 5W1H, ECRS and economic principle of motion is applied to improve the bottleneck. Through good results in comparison with the old scheme, the balance rate is increased and the product efficiency is enhanced.
Keywords: Balance rate; Method study; Work measurement; Work study (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-40060-5_9
Ordering information: This item can be ordered from
http://www.springer.com/9783642400605
DOI: 10.1007/978-3-642-40060-5_9
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().