Research on Construction Management Based on the WSR System Methodology
Wei-na Ji () and
Jun-jie Wang
Additional contact information
Wei-na Ji: Ocean University of China
Jun-jie Wang: Ocean University of China
A chapter in Proceedings of 20th International Conference on Industrial Engineering and Engineering Management, 2013, pp 367-374 from Springer
Abstract:
Abstract This article applies Wuli-Shili-Renli system methodology to project construction management. It discusses principles of construction management based on the WSR; puts forward suggestions about the optimization of construction management from three aspects respectively: Wu-li, Shi-li, Ren-li. The aim is to realize the scientific and systematic management for construction process.
Keywords: Construction; Management; Project; WSR methodology (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-40072-8_36
Ordering information: This item can be ordered from
http://www.springer.com/9783642400728
DOI: 10.1007/978-3-642-40072-8_36
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().