Studies of Balance and Simulation of Gearbox Assembly Line Based on Flexsim Software
Hong-ying Shan (),
Li-bin Zhang,
Xin-zhao Gao and
Xiang-bo Li
Additional contact information
Hong-ying Shan: Jilin University
Li-bin Zhang: Jilin University
Xin-zhao Gao: Jilin University
Xiang-bo Li: Jilin University
A chapter in Proceedings of 20th International Conference on Industrial Engineering and Engineering Management, 2013, pp 83-90 from Springer
Abstract:
Abstract The balance of production line would definitely help the workers and facilities increase the operational efficiency. Computer modeling and simulation can shorten the R&D cycle, predict and optimize the layout of production line. After analyzing the gearbox assembly line and drawing flow charts, we can work out a simulation model and then use Flexsim software and heuristic balancing algorithm to make gearbox assembly line more reasonable. By comparing the balance of gearbox assembly line. From the comparison of the indicators before and after simulation and the utilization of the station, we can firmly draw the conclusion that the transmission efficiency of assembly line production is significantly improved.
Keywords: Balance; Flexsim; Gearbox assembly line; Simulation (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-40072-8_8
Ordering information: This item can be ordered from
http://www.springer.com/9783642400728
DOI: 10.1007/978-3-642-40072-8_8
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().