The Choice of Material Procurement Mode of Beijing Metro Company
Yining Zheng () and
Xianliang Shi ()
Additional contact information
Yining Zheng: Beijing Jiaotong University
Xianliang Shi: Beijing Jiaotong University
A chapter in LISS 2014, 2015, pp 161-166 from Springer
Abstract:
Abstract In recent years, the development speed of the Beijing subway system has increased, So an efficient scientific procurement and supply mode is needed. This paper starts with the current situation of the Beijing Metro Company. It investigates the status of the material procurement mode and the problem with this mode. Then the thesis use multi-criteria ABC classification to classify materials to apply the mixed procurement mode. For important materials, use centralized procurement mode. And keep the original scattered procurement mode for unimportant materials or the materials which is not suitable for scattered procurement mode. This mixed procurement can not only reduce cost, improve the effectiveness, but is also easier to carry out.
Keywords: Beijing metro company; Multi-criteria ABC classification; Centralized procurement mode; Scattered procurement mode; Mixed procurement (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-662-43871-8_25
Ordering information: This item can be ordered from
http://www.springer.com/9783662438718
DOI: 10.1007/978-3-662-43871-8_25
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().