Material Requirement Planning Application Example Analysis-Shuohuang Railway Company Case Study
Qiuping Liu () and
Xueli Wang ()
Additional contact information
Qiuping Liu: Shijiazhuang Institute of Railway Technology
Xueli Wang: Shijiazhuang Institute of Railway Technology
A chapter in LISS 2014, 2015, pp 253-258 from Springer
Abstract:
Abstract The MRP management is the main content and the key link of enterprise logistics management and it is the premise of enterprise timely and accurate material supplying. In the case of the MRP management of SHRC, this paper states the MRP management present situation of SHRC, and thinks due to the staff pay less attention to MRP management work, it has many problems, for example the timeliness and accuracy are poor. Aiming at these problems, this paper puts forward some solutions.
Keywords: Material requirement planning (MRP); Application; Railway (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-662-43871-8_39
Ordering information: This item can be ordered from
http://www.springer.com/9783662438718
DOI: 10.1007/978-3-662-43871-8_39
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().