Research on Project Cost of Overseas Power Plant—Take Acompany’s X Power Plant Project for Example
Mingxuan Yu (),
Chunpeng Li and
Lingyun Wei
Additional contact information
Mingxuan Yu: Renmin University of China
Chunpeng Li: Renmin University of China
Lingyun Wei: Renmin University of China
Chapter Chapter 80 in Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate, 2015, pp 971-982 from Springer
Abstract:
Abstract Traditional cost management starts with cost plan, goes through cost control, ends with cost accounting. As a special case in cost management, cost management in general contracting of overseas power plant project has dynamic and continuous features besides traditional cost management features. If Chinese power plants want to win in the international competition, they have to supervise the whole project process to ensure overall revenue; to minimize marginal cost by ensuring synergetic management of project schedule, safety, quality and cost control during project biding, design and procurement; to maximize project revenue through controlling project environment by laws and regulations, ethnic customs and etc.
Keywords: Power plant project; Cost management; Case study (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-662-46994-1_80
Ordering information: This item can be ordered from
http://www.springer.com/9783662469941
DOI: 10.1007/978-3-662-46994-1_80
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().