Cost of construction of nuclear power plants
E. J. Snell
Additional contact information
E. J. Snell: Imperial College, Department of Mathematics
Chapter Example G in Applied Statistics, 1987, pp 38-49 from Springer
Abstract:
Abstract Table G.1 gives data, reproduced by permission of the Rand Corporation, from a report (Mooz, 1978) on 32 light water reactor (LWR) power plants constructed in the USA. It is required to predict the capital cost involved in the construction of further LWR power plants. The notation used in Table G.1 is explained in Table G.2. The final six lines of data in Table G.1 relate to power plants for which there were partial turnkey guarantees and for which it is possible that some manufacturers’ subsidies might be hidden in the quoted capital costs.
Keywords: Power Plant; Nuclear Power Plant; Capital Cost; Stepwise Selection; Normal Probability Plot (search for similar items in EconPapers)
Date: 1987
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-94-011-6946-2_10
Ordering information: This item can be ordered from
http://www.springer.com/9789401169462
DOI: 10.1007/978-94-011-6946-2_10
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().