Barrick Gold: A Perfect Storm at Pascua Lama
N. Craig Smith () and
Erin McCormick
Additional contact information
N. Craig Smith: INSEAD
Erin McCormick: INSEAD
Chapter 12 in Managing Sustainable Business, 2019, pp 227-242 from Springer
Abstract:
Abstract This case is about a gold mining company that sought to practice “responsible mining” by addressing environmental and stakeholder concerns, but which nevertheless attracted protests. Barrick Gold Corporation invested $4.8 billion developing the Pascua Lama gold mine in a glacial region of South America, but opposition has blocked the project.
Keywords: Pascua Lama; Barrick Gold Corporation; Gold Mining Company; Chilean Side; Montreal Gazette (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-94-024-1144-7_12
Ordering information: This item can be ordered from
http://www.springer.com/9789402411447
DOI: 10.1007/978-94-024-1144-7_12
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().