EconPapers    
Economics at your fingertips  
 

Design and Application of Prefabricated Substation Based on BIM Technology

Clyde Zhengdao Li, Zhe Chen, Yiyu Zhao (), Meizhuan Zhou and Limei Zhang
Additional contact information
Clyde Zhengdao Li: Shenzhen University
Zhe Chen: Shenzhen University
Yiyu Zhao: Shenzhen University
Meizhuan Zhou: Shenzhen University
Limei Zhang: Shenzhen University

A chapter in Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate, 2021, pp 1889-1907 from Springer

Abstract: Abstract As the core of advanced digital management application technology, BIM is widely used in various infrastructure construction. Prefabricated assembly substation uses advanced, reliable and environmentally friendly intelligent modular units to form an intensive closed substation. It takes digitization, networking and standardization of information as its basic requirements. Compared with conventional substation, it occupies less space, has shorter construction period, lower cost, no noise and no detection. Radiation-free and maintenance-free environment-friendly intelligent substation. A real digital information model of the whole substation depth is established by combining the Internet, big data, IoT and the construction process. Decomposition is performed in accordance with construction management and control steps to achieve model construction growth, according to Gantt chart schedule. The corresponding mechanism between the 2D code scan and the model is established, and the relationship between the digital model and the real nodes in the construction process is implemented. The life cycle of power transmission and transformation projects is facilitated by establishing appropriate management and control platform and developing the functional modules of the app. The Building Information Modeling technology is used to accurately calculate project quantities, strengthen the management and control of material cost information, provide efficient engineering quantities calculation and reduce cost. Based on the prefabricated assembly substation of 110 kV Longhua Center, this paper gives the corresponding case introduction and promotion suggestions from the aspects of prefabricated component production, assembly construction, information management technology and so on, aiming at applying it to the construction management stage of the substation industrialization project.

Keywords: Prefabricated substation; BIM; Environmental friendly; Shenzhen (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-981-15-8892-1_132

Ordering information: This item can be ordered from
http://www.springer.com/9789811588921

DOI: 10.1007/978-981-15-8892-1_132

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-23
Handle: RePEc:spr:sprchp:978-981-15-8892-1_132