EconPapers    
Economics at your fingertips  
 

Research on Construction Supply Chain Management Strategy Selection of the Large-Scale Assembly Enterprises Based on SWOT-AHP

Xiaojin Xu (), Lianbo Zhu (), Jie Chen and Yilei Huang
Additional contact information
Xiaojin Xu: Suzhou University of Science and Technology
Lianbo Zhu: Suzhou University of Science and Technology
Jie Chen: Suzhou University of Science and Technology
Yilei Huang: South Dakota State University

A chapter in Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate, 2021, pp 2059-2071 from Springer

Abstract: Abstract Under the government’s incentive policies of vigorously promoting assembly construction, the large-scale assembly enterprises are flourishing in China. The traditional assembling enterprise management mode has some disadvantages, such as the lagging management means, low management efficiency. The fund, material and information flow of the management link are not coherent. As a result, the assembly component productions cannot meet the market demand, which greatly hinders the popularization and application of assembly technology. The SWOT analysis method is used to analyze the internal advantages, disadvantages, external opportunities and threats of these enterprises based on the construction supply chain management technology. The hierarchical analysis model is established based on the SWOT analysis results. The strategic quadrilateral is drawn by calculating the relative importance weight of the lowest level factor relative to the highest level factor in the hierarchical analysis model. Then, the order of selection of construction supply chain management strategy in the large-scale assembly enterprises is obtained, which is the growth SO strategy, reversed WO strategy, diversified ST strategy and defensive WT strategy. The research results will provide new strategic idea and scientific basis in the large assembly enterprises to use the construction supply chain management.

Keywords: Large-scale assembly enterprises; Construction supply chain management; SWOT; AHP (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-981-15-8892-1_144

Ordering information: This item can be ordered from
http://www.springer.com/9789811588921

DOI: 10.1007/978-981-15-8892-1_144

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-02
Handle: RePEc:spr:sprchp:978-981-15-8892-1_144