BHP(E): Rejuvenation and Renovation Towards a New Century
Don Argus () and
Danny Samson ()
Additional contact information
Don Argus: Australia Advisory Board
Danny Samson: University of Melbourne
Chapter Chapter 13 in Strategic Leadership for Business Value Creation, 2021, pp 331-351 from Springer
Abstract:
Abstract In the late 1990’s, challenges abounded at BHP. Magma Copper had been written back to zero, the HBI plant was plagued with construction stoppages which saw cost blowouts, and more pressure was looming over the troubled Beenup mineral sands play and the Hartley platinum mine in Zimbabwe. Steel prices had also plummeted, iron ore prices were slashed in negotiations with world steelmakers and serious questions were being asked about BHP’s return on its weighted average cost of its capital.
Date: 2021
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-981-15-9430-4_13
Ordering information: This item can be ordered from
http://www.springer.com/9789811594304
DOI: 10.1007/978-981-15-9430-4_13
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().