Prologue
Sharat Sharma ()
Additional contact information
Sharat Sharma: Delhi Metro Rail Corporation Ltd., Former Director Operations
Chapter 1 in Infrastructure Project Completion, 2026, pp 1-4 from Springer
Abstract:
Abstract Timely project completion, without cost overruns, needs a paradigm shift in approach and collaboration with contractors. The content is structured into four sections and fifteen chapters, covering essentials, contract management, legal perspectives and execution strategies. The book provides actionable insights, case studies and innovative solutions for overcoming challenges in infrastructure projects.
Date: 2026
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-981-95-6441-5_1
Ordering information: This item can be ordered from
http://www.springer.com/9789819564415
DOI: 10.1007/978-981-95-6441-5_1
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().