Scoping the First Build (Without Losing the Plot)
Anusha Ravi () and
Nitika Malhotra ()
Chapter Chapter 3 in Launching Enterprise Products, 2026, pp 21-26 from Springer
Abstract:
AbstractSo what have we done so far? We have defined the problem very clearly, and we have gotten the stakeholders excited and engaged, too. So, that's it. You are in the clear. Let's go build. Well—almost, but not quite. Any product building is like playing Russian roulette. You could have defined an obvious problem, validated it with the users, and thought it was a slam dunk. But at the time of launch, it could still be a hit or miss. Building too quickly and taking user feedback verbatim can steer you away from your north star, while being too slow lands you in analysis paralysis.
Date: 2026
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:979-8-8688-2661-0_3
Ordering information: This item can be ordered from
http://www.springer.com/9798868826610
DOI: 10.1007/979-8-8688-2661-0_3
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().