The Time/Cost Trade-off Problems

Gündüz Ulusoy and Öncü Hazır
Additional contact information
Gündüz Ulusoy: Sabancı University
Öncü Hazır: Rennes School of Business

Chapter Chapter 5 in An Introduction to Project Modeling and Planning, 2021, pp 141-165 from Springer

Abstract: Abstract While executing the project activities, it is often possible to reduce the duration of some of the activities leading to a reduction in the project makespan at the expense of additional costs. The resulting time/cost trade-off problem has been widely studied in the literature and is the focus of this Chapter. Direct and overhead/indirect project cost items are discussed, different time cost functions are introduced and used to define time-cost trade-off problems. In this context, project crashing, activity modes and multi-mode project scheduling are introduced. To solve the trade-off problems, we formulate mathematical models for well-known continuous and discrete time/cost trade-off problems.

Keywords: Direct project costs; Overhead/indirect project costs; Time/cost trade-off; Project crashing; Multi-mode project scheduling (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sptchp:978-3-030-61423-2_5

Ordering information: This item can be ordered from
http://www.springer.com/9783030614232

DOI: 10.1007/978-3-030-61423-2_5

Access Statistics for this chapter

More chapters in Springer Texts in Business and Economics from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:sptchp:978-3-030-61423-2_5