Decarbonization and wholesale price impacts of RES and BESS incentives: self-financing modelling of FER-X and MACSE policies to 2030
Sara Floriana Zanini,
Edoardo Somenzi,
Federico Bruno Pontoni and
Filippo Del Grosso
No 417443, FEEM Working Papers from Fondazione Eni Enrico Mattei (FEEM)
Abstract:
Italy has recently introduced two complementary support mechanisms whose costs may ultimately be recovered through consumers’ electricity bills. FER-X is a two-way Contract for Difference (CfD) scheme for renewable energy sources (RES). MACSE is a long-term procurement mechanism for electricity storage. Both are designed to be self-financing: FER-X through the reverse payments of the two-way CfD, and MACSE through clawback provisions that return time-shifting revenues to the system operator. This paper provides the first joint quantitative assessment of the two mechanisms. It asks whether the self-financing features embedded in each design are sufficient to offset the cost of rising variable renewable (VRES) and battery storage (BESS) penetration, or whether a residual burden is passed on to final consumers. To answer this, we trace two channels: how VRES deployment affects capture prices and FER-X’s CfD dynamics, and how BESS deployment affects the value of time-shifting and MACSE’s net premium. Using hourly PLEXOS simulations of the seven Italian bidding zones over 2027–2030, we combine two VRES pathways, one meeting and one lagging the 2024 NECP targets, with two BESS trajectories, into four scenarios. The VRES pathway dominates all outcomes. Meeting NECP targets raises the national RES share in 2030 from 62% to 76%, whereas faster BESS deployment adds only around one percentage point. The self-financing capacity of the two mechanisms responds to deployment pace in opposite directions. Faster VRES deployment deepens price cannibalisation, lowering value factors and narrowing FER-X reverse payments, while the resulting price volatility allows MACSE to more than self-finance. Under slower VRES deployment, FER-X returns more to the system, but MACSE leaves a residual consumer cost when battery deployment is accelerated. Over 2027–2030, the two mechanisms together reduce total system cost in every scenario, and the NECP-compliant pathway yields the lowest total system cost. This suggests that storage incentives complement, but cannot substitute for, timely renewable deployment.
Keywords: Environmental Economics and Policy; Resource/Energy Economics and Policy (search for similar items in EconPapers)
Pages: 61
Date: 2026-11-09
References: Add references at CitEc
Citations:
Downloads: (external link)
https://ageconsearch.umn.edu/record/417443/files/NDL2026-26-1.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ags:feemwp:417443
DOI: 10.22004/ag.econ.417443
Access Statistics for this paper
More papers in FEEM Working Papers from Fondazione Eni Enrico Mattei (FEEM) Contact information at EDIRC.
Bibliographic data for series maintained by AgEcon Search ().