Production Risk and the Estimation of Ex Ante Cost Functions
GianCarlo Moschini
No 18443, Hebrew University of Jerusalem Archive from Hebrew University of Jerusalem
Abstract:
Cost function estimation under production uncertainty is problematic because the relevant cost is conditional on unobservable expected output. If input demand functions are also stochastic, then a nonlinear errors-in-variables model is obtained and standard estimation procedures typically fail to attain consistency. But by exploiting the full implications of the expected profit maximization hypothesis that gives rise to ex ante cost functions, it is shown that the errors-in-variables problem can be effectively removed, and consistent estimation of the parameters of interest can be achieved. A Monte Carlo experiment illustrates the advantages of the proposed procedure as well as the pitfalls of other existing estimators.
Keywords: Risk; and; Uncertainty (search for similar items in EconPapers)
Pages: 34
Date: 2001
References: Add references at CitEc
Citations:
Downloads: (external link)
https://ageconsearch.umn.edu/record/18443/files/wp000262.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ags:hebarc:18443
DOI: 10.22004/ag.econ.18443
Access Statistics for this paper
More papers in Hebrew University of Jerusalem Archive from Hebrew University of Jerusalem
Bibliographic data for series maintained by AgEcon Search ().