Spicer Off-Highway Products Division - Brugge - improves its lead time and scheduling performance
Nico J. Vandaele,
Marc R. Lambrecht,
Nicolas de Schuyter and
Rony Cremmry
Working Papers from University of Antwerp, Faculty of Business and Economics
Abstract:
Spicer Off-Highway Products Division (a division of Dana Corporation) asked us to develop OR tools to improve the due date performance and to shorten the manufacturing lead time of its powershift transmission plant in Brugge, Belgium. We modelled the manufacturing system as a queueing model, and used the model to analyze and evaluate improvement schemes (layout changes, product-mix decisions, lot-sizing decisions, and lead time estimations). Next, we developed a finite scheduler to improve the detailed scheduling of the shop. Our modelling effort contributed to the successful combination of analysis, planning and detailed scheduling. The plant increased productivity by 27.3 percentage points, decreased manufacturing lead times by a factor two to three, increased its workforce by 41 percent, and decreased its operating costs. The division is now profitable.
Pages: 24 pages
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://repository.uantwerpen.be/docman/irua/a945dd/b842d108.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ant:wpaper:2000003
Access Statistics for this paper
More papers in Working Papers from University of Antwerp, Faculty of Business and Economics Contact information at EDIRC.
Bibliographic data for series maintained by Joeri Nys ().