REAL ESTATE PORTFOLIO CONSTRUCTION AND ESTIMATION RISK
Stephen Lee and
Simon Stevenson
ERES from European Real Estate Society (ERES)
Abstract:
The use of MPT in the construction real estate portfolios has two serious limitations when used in an ex-ante framework: (1) the intertemporal instability of the portfolio weights and (2) the sharp deterioration in performance of the optimal portfolios outside the sample period used to estimate asset mean returns. Both problems can be traced to wide fluctuations in sample means Jorion (1985). Thus the use of a procedure that ignores the estimation risk due to the uncertain in mean returns is likely to produce sub-optimal results in subsequent periods. This suggests that the consideration of the issue of estimation risk is crucial in the use of MPT in developing a successful real estate portfolio strategy. Therefore, following Eun & Resnick (1988), this study extends previous ex-ante based studies by evaluating optimal portfolio allocations in subsequent test periods by using methods that have been proposed to reduce the effect of measurement error on optimal portfolio allocations.
JEL-codes: R3 (search for similar items in EconPapers)
Date: 2000-06-01
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://eres.architexturez.net/doc/oai-eres-id-eres2000-070 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:arz:wpaper:eres2000_070
Access Statistics for this paper
More papers in ERES from European Real Estate Society (ERES) Contact information at EDIRC.
Bibliographic data for series maintained by Architexturez Imprints ().