Let's talk: Public Evaluation of Large Projects: Variational Inequialities, bilevel programming and complementarity. A Survey
Josep Maria Vegara-Carrió ()
UFAE and IAE Working Papers from Unitat de Fonaments de l'Anàlisi Econòmica (UAB) and Institut d'Anàlisi Econòmica (CSIC)
Abstract:
Large projects evaluation rises well known difficulties because -by definition- they modify the current price system; their public evaluation presents additional difficulties because they modify too existing shadow prices without the project. This paper analyzes -first- the basic methodologies applied until late 80s., based on the integration of projects in optimization models or, alternatively, based on iterative procedures with information exchange between two organizational levels. New methodologies applied afterwards are based on variational inequalities, bilevel programming and linear or nonlinear complementarity. Their foundations and different applications related with project evaluation are explored. As a matter of fact, these new tools are closely related among them and can treat more complex cases involving -for example- the reaction of agents to policies or the existence of multiple agents in an environment characterized by common functions representing demands or constraints on polluting emissions.
Pages: 44
Date: 2012-09-20
New Economics Papers: this item is included in nep-ppm
References: Add references at CitEc
Citations:
Downloads: (external link)
http://pareto.uab.es/wp/2012/90912.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aub:autbar:909.12
Access Statistics for this paper
More papers in UFAE and IAE Working Papers from Unitat de Fonaments de l'Anàlisi Econòmica (UAB) and Institut d'Anàlisi Econòmica (CSIC) Contact information at EDIRC.
Bibliographic data for series maintained by Xavier Vila ().