EconPapers    
Economics at your fingertips  
 

The Army’s Costs to Eliminate Its Deferred Maintenance Backlog and to Renovate and Modernize Its Buildings

Congressional Budget Office

No 58220, Reports from Congressional Budget Office

Abstract: CBO analyzed roughly 49,000 buildings in use on Army bases in the United States that the Army’s active component is responsible for maintaining. The cost of eliminating the maintenance backlog and returning the buildings to standards matching the Department of Defense’s goals would be about $19 billion (in 2020 dollars). The cost of renovating and modernizing the buildings within their current footprint (the area they cover on the ground) to fully provide users with the capability to fulfill their missions would be an additional $34 billion.

JEL-codes: H41 H54 H56 H82 L32 N42 O18 R53 (search for similar items in EconPapers)
Date: 2022-11-28
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.cbo.gov/system/files/2022-11/58220-army-buildings.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:cbo:report:58220

Access Statistics for this paper

More papers in Reports from Congressional Budget Office Contact information at EDIRC.
Bibliographic data for series maintained by ().

 
Page updated 2025-03-19
Handle: RePEc:cbo:report:58220