The Prospects for High Occupancy/Toll (HOT) Lanes: Where Should They Be Implemented
Joy Dahlgren
Institute of Transportation Studies, Research Reports, Working Papers, Proceedings from Institute of Transportation Studies, UC Berkeley
Abstract:
There is increasing interest in building new high occupancy toll (HOT) lanes and in converting high occupancy vehicle (HOV) lanes with unused capacity to HOT lanes. Like HOV lanes, HOT lanes provide an incentive for travelers to use HOVs, but unlike HOV lanes, they can always be well utilized by varying the toll over the congested period, thus providing more congestion relief than an HOV lane with unused capacity. This report provides guidelines regarding the circumstances in which HOT, HOV, and mixed flow lanes are most appropriate. Using a queueing model combined with a mode choice model, the reduction in delay from adding an HOV, HOT, or mixed flow lane to an existing three-lane freeway was estimated for three levels of initial HOV use and three levels of initial delay.
Keywords: Engineering (search for similar items in EconPapers)
Date: 2001-09-01
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.escholarship.org/uc/item/196285zx.pdf;origin=repeccitec (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cdl:itsrrp:qt196285zx
Access Statistics for this paper
More papers in Institute of Transportation Studies, Research Reports, Working Papers, Proceedings from Institute of Transportation Studies, UC Berkeley Contact information at EDIRC.
Bibliographic data for series maintained by Lisa Schiff ().