EconPapers    
Economics at your fingertips  
 

Shifting Air Travel to High-Speed Rail Could Save $300 Million in Reduced Airport Delays

Kaijing Ding and Mark Hansen

Institute of Transportation Studies, Research Reports, Working Papers, Proceedings from Institute of Transportation Studies, UC Berkeley

Abstract: California High-Speed Rail (HSR) is a publicly funded high-speed rail system currently under construction in the state. According to the California High-Speed Rail Authority (CHSRA), service on the initial 119-mile segment from Madera to Bakersfield is projected to begin in 2029. The full Phase 1 will later connect Anaheim and Los Angeles with San Francisco via the Central Valley in 2033. The ride between Los Angeles and San Francisco will cover a total distance of 380 miles and take 2 hours and 40 minutes. Caltrans’ 2021 Interregional Transportation Strategic Plan, makes HSR the state’s highest transportation priority for the San Francisco Bay Area — Los Angeles corridor. Quantifying its public benefits are difficult but include reducing traffic demands on California’s roads and airports.

Keywords: Engineering (search for similar items in EconPapers)
Date: 2022-06-01
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.escholarship.org/uc/item/2pb3q606.pdf;origin=repeccitec (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:cdl:itsrrp:qt2pb3q606

Access Statistics for this paper

More papers in Institute of Transportation Studies, Research Reports, Working Papers, Proceedings from Institute of Transportation Studies, UC Berkeley Contact information at EDIRC.
Bibliographic data for series maintained by Lisa Schiff ().

 
Page updated 2025-11-28
Handle: RePEc:cdl:itsrrp:qt2pb3q606