Renegotiations and Corruption in Infrastructure: The Odebrecht Case
Ronald Fischer,
Nicolás Campos,
Eduardo Engel and
Alexander Galetovic ()
No 346, Documentos de Trabajo from Centro de Economía Aplicada, Universidad de Chile
Abstract:
In 2016, Brazilian construction firm Odebrecht was fined $2.6 billion by the US Department of Justice (DOJ). According to the plea agreement, between 2001 and 2016 Odebrecht paid $788 million in bribes in 10 Latin American and two African countries in more than 100 large projects. The DOJ estimated that bribe payments increased Odebrecht’s profits by $2.4 billion. Judicial documents and press reports on the Odebrecht case reveal detailed information on the workings of corruption in the infrastructure sector. Based on these sources we establish five facts. First, for projects where Odebrecht paid bribes, renegotiations amounted to 71.3 percent of initial investment estimates, compared with 6.5 percent for projects where Odebrecht paid no bribes. Second, Odebrecht’s bribes were less than one percent of a project’s final investment. Third, the profits Odebrecht obtained from bribes as well as its overall profits were relatively small: around 1 to 2 percent of sales. Fourth, the creation of the Division of Structured Operations (DSO) by Odebrecht in 2006 led to major reductions in the firm’s costs of paying bribes and recipients’ costs of hiding the ilegal proceeds. Fifth, following the creation of the DSO, Odebrecht’s sales multiplied tenfold in four years, while its profits remained relatively small. We build a model where firms compete for a project, anticipating a bilateral renegotiation in which their bargaining power will be larger if they pay a bribe. If cost dispersion among firms is small, profits are small in equilibrium even when bribes are paid. When one firm unilaterally innovates by making bribe payments more efficient, its market share increases substantially while profits, which depend on cost advantages and the magnitude of bribes, remain small. A parametrization using the DOJ’s data suggests that after the creation of the DSO, Odebrecht enjoyed an almost 70 percent cost advantage in bribing. JEL Codes: H54, H57, K42. Publicado en: J. of Economic Perspectives 35(2), Spring 171-190, 2021. Key words: auctions bribes corruption fundamental transformation Infrastructure lowballing renegotiations
Date: 2019
New Economics Papers: this item is included in nep-cta, nep-lam and nep-ppm
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.cea-uchile.cl/wp-content/uploads/2021/0 ... recht_2019_09_02.pdf (application/pdf)
Related works:
Working Paper: Renegotiations and corruption in infrastructure: The Odebrecht case (2019) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:edj:ceauch:346
Access Statistics for this paper
More papers in Documentos de Trabajo from Centro de Economía Aplicada, Universidad de Chile Contact information at EDIRC.
Bibliographic data for series maintained by ().