Logistic planning and control of reworking perishable production defectives
Ruud Teunter and
S.D.P. Flapper
No EI 2001-36, Econometric Institute Research Papers from Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute
Abstract:
We consider a production line that is dedicated to a single product. Produced lots may be non-defective, reworkable defective, or non-reworkable defective. The production line switches between production and rework. After producing a fixed number (N) of lots, all reworkable defective lots are reworked. Reworkable defectives are perishable, i.e., worsen while held in stock. We assume that the rework time and the rework cost increase linear with the time that a lot is held in stock. Therefore, N should not be too large. On the other hand, N should not be too small either, since there are set-up times and costs associated with switching between production and rework. For a given N, we derive an explicit expression for the average profit (sales revenue minus costs). Using that expression, the optimal value for N can be determined numerically.
Keywords: batch production; perishability; rework (search for similar items in EconPapers)
Date: 2001-11-28
References: Add references at CitEc
Citations:
Downloads: (external link)
https://repub.eur.nl/pub/1704/feweco20011128143057.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ems:eureir:1704
Access Statistics for this paper
More papers in Econometric Institute Research Papers from Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute Contact information at EDIRC.
Bibliographic data for series maintained by RePub ( this e-mail address is bad, please contact ).