EconPapers    
Economics at your fingertips  
 

Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty

Adriaan van der Weijde and Benjamin F. Hobbs
Additional contact information
Benjamin F. Hobbs: Electricity Policy Research Group, University of Cambridge Whiting School of Engineering, The Johns Hopkins University

No EPRG 1102, Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge

Keywords: Decision making; electricity; transmission; planning; uncertainty (search for similar items in EconPapers)
JEL-codes: C61 L94 (search for similar items in EconPapers)
Date: 2011-01
References: Add references at CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
https://www.jbs.cam.ac.uk/wp-content/uploads/2023/12/eprg-wp1102.pdf (application/pdf)

Related works:
Working Paper: Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty (2011) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:enp:wpaper:eprg1102

Access Statistics for this paper

More papers in Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge Contact information at EDIRC.
Bibliographic data for series maintained by Ruth Newman ().

 
Page updated 2025-03-19
Handle: RePEc:enp:wpaper:eprg1102