Finding the Optimal Approach for Allocating and Realising Distribution System Capacity: Deciding between Interruptible Connections and Firm DG Connections
Karim Anaya and
Michael Pollitt
No EPRG 1320, Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge
Keywords: cost benefit analysis; distributed generation; interruptible connections (non-firm) (search for similar items in EconPapers)
JEL-codes: D61 L51 L94 Q21 Q40 Q48 (search for similar items in EconPapers)
Date: 2013-10
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.jbs.cam.ac.uk/wp-content/uploads/2023/12/eprg-wp1320.pdf (application/pdf)
Related works:
Working Paper: Finding the Optimal Approach for Allocating and Realising the Distribution System Capacity: Decidng between Interruptible Connections and Firm DG Connections 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:enp:wpaper:eprg1320
Access Statistics for this paper
More papers in Working Papers from Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge Contact information at EDIRC.
Bibliographic data for series maintained by Ruth Newman ().