Abstract:
Capacity remuneration mechanisms exist in many electricity markets. Capacity mechanism designs do not explicitly consider the effects of refurbishment of existing generation units in order to increase their reliability. This paper presents a mixed complementarity problem with endogenous probabilities to examine the impact of refurbishment on electricity prices and generation investment. Capacity payments are found to increase reliability when refurbishment is not possible, while capacity payments and reliability options yield similar results when refurbishment is possible. Final costs to consumers are similar under the two mechanisms with the exception of the initial case of overcapacity.
Date: 2015-07
New Economics Papers: this item is included in nep-ene and nep-reg
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
https://www.esri.ie/pubs/WP507.pdf (application/pdf)
Our link check indicates that this URL is bad, the error code is: 404 Not Found (https://www.esri.ie/pubs/WP507.pdf [301 Moved Permanently]--> https://www.esri.ie/system/files?file=media/file-uploads/2015-08/WP507.pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:esr:wpaper:wp507
Access Statistics for this paper
More papers in Papers from Economic and Social Research Institute (ESRI) Contact information at EDIRC.
Bibliographic data for series maintained by Sarah Burns ().