EconPapers    
Economics at your fingertips  
 

The land assembly problem revisited

Flavio Menezes and Rohan Pitchford

No 427, FGV EPGE Economics Working Papers (Ensaios Economicos da EPGE) from EPGE Brazilian School of Economics and Finance - FGV EPGE (Brazil)

Abstract: As in the standard land assembly problem, a developer wants to buy two adjacent blocks of land belonging to two di¤erent owners. The value of the two blocks of land to the developer is greater than the sum of the individual values of the blocks for each owner. Unlike the land assembly literature, however, our focus is on the incentive that each lot owner has to delay the start of negotiations, rather than on the public goods nature of the problem. An incentive for delay exists, for example, when owners perceive that being last to sell will allow them to capture a larger share of the joint surplus from the development. We show that competition at point of sale can cause equilibrium delay, and that cooperation at point of sale will eliminate delay.

Date: 2001-06-01
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://repositorio.fgv.br/bitstreams/679430f7-1d6 ... 69d20d852cd/download (application/pdf)

Related works:
Journal Article: The land assembly problem revisited (2004) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:fgv:epgewp:427

Access Statistics for this paper

More papers in FGV EPGE Economics Working Papers (Ensaios Economicos da EPGE) from EPGE Brazilian School of Economics and Finance - FGV EPGE (Brazil) Contact information at EDIRC.
Bibliographic data for series maintained by Núcleo de Computação da FGV EPGE ().

 
Page updated 2025-03-30
Handle: RePEc:fgv:epgewp:427