EconPapers    
Economics at your fingertips  
 

Formula for Manufacturing Profit increase based on Thermodynamic Model

Michael George (mike@entropy2718.com)

No 620, Working Papers from Institute of Business Entropy

Abstract: Predictive cost reduction based on a thermodynamic model, in which parameters associated with a process are accessed. The parameters include a quantity of units of Work-in-process at first and second times, and first and second constants respectively indicative of growth between the first and second times, and of a translated reduction of the Work-in-process to a reduction of cost. A thermodynamic model is applied to the accessed parameters, and a predictive cost reduction associated with an improvement of the process based on applying the thermodynamic model is output.

Keywords: Equation of Projected Cost Reduction; Process Entropy; Information; Complexity; Waste; Little’s Law; Shannon; Boltzmann; Carnot (search for similar items in EconPapers)
JEL-codes: C10 C11 C13 C24 C51 D8 L11 L15 L6 L7 L8 M21 (search for similar items in EconPapers)
Pages: 35 pages
Date: 2011-11
References: Add references at CitEc
Citations:

Downloads: (external link)
ftp://ibe.hostedftp.com/~ibe/econ/RePEc/PDF/Formul ... ermodynamicModel.pdf First version, 2011 (application/pdf)
Our link check indicates that this URL is bad, the error code is: 404 Failed to CWD to directory econ [No such directory.]

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:geg:wpaper:0620

Access Statistics for this paper

More papers in Working Papers from Institute of Business Entropy
Bibliographic data for series maintained by Michael L. George (mike@entropy2718.com).

 
Page updated 2025-03-19
Handle: RePEc:geg:wpaper:0620