Time Management Strategies for Contractors: Overcoming Challenges in the Malaysian Construction Industry during the Covid-19 Pandemic

Puteri Nur Farah Naadia Mohd Fauzi ()
Additional contact information
Puteri Nur Farah Naadia Mohd Fauzi: Northumbria University, Newcastle upon Tyne, NE1 8ST, United Kingdom Author-2-Name: Muhammad Nazirul Pasaruddin Author-2-Workplace-Name: Pembinaan Purcon Sdn Bhd, 51200 Kuala Lumpur, Malaysia Author-3-Name: Author-3-Workplace-Name: Author-4-Name: Author-4-Workplace-Name: Author-5-Name: Author-5-Workplace-Name: Author-6-Name: Author-6-Workplace-Name: Author-7-Name: Author-7-Workplace-Name: Author-8-Name: Author-8-Workplace-Name:

GATR Journals from Global Academy of Training and Research (GATR) Enterprise

Abstract: "Objective - This research aims to explore how contractors managed on-site construction work during the COVID-19 pandemic in Malaysia, with a focus on the time management challenges they encountered. It seeks to determine the procedures employed, identify the challenges faced, and develop comprehensive strategies to ensure timely project delivery within contractual obligations. Methodology/Technique - The study adopts a mixed-method approach, involving an extensive literature review and questionnaire surveys to gather data from construction industry stakeholders, particularly contractors. Findings - The research reveals that the implementation of Standard Operating Procedures (SOPs) at construction sites, mandated by the Malaysian government during the pandemic, posed significant challenges to contractors in managing work progress and productivity. Strategies developed in this study provide actionable guidance for effectively addressing these time management challenges. Novelty - This research contributes original insights into the specific time management challenges faced by contractors during the pandemic and proposes practical, industry-specific strategies to mitigate these issues. It bridges the gap in existing literature by focusing on pandemic-specific constraints in the Malaysian construction industry. Type of Paper - Empirical"

Keywords: Construction work; COVID-19 Pandemic; On-site; Strategies; Time management. (search for similar items in EconPapers)
JEL-codes: K11 L74 P46 (search for similar items in EconPapers)
Pages: 11
Date: 2025-03-31
References: Add references at CitEc
Citations:

Published in Journal of Management and Marketing Review, Volume 10, Issue1

Downloads: (external link)
http://gatrenterprise.com/GATRJournals/JMMR/pdf_fi ... a%20Mohd%20Fauzi.pdf (application/pdf)
http://gatrenterprise.com/GATRJournals/online_submission.html

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gtr:gatrjs:jmmr345

DOI: 10.35609/jmmr.2025.10.1(2)

Access Statistics for this paper

More papers in GATR Journals from Global Academy of Training and Research (GATR) Enterprise
Bibliographic data for series maintained by Prof. Dr. Abd Rahim Mohamad ().

 
Page updated 2025-04-08
Handle: RePEc:gtr:gatrjs:jmmr345