Project leaders as team boundary spanners: Relational antecedents and performance outcomes
Sébastien Brion,
Vincent Chauvet (),
Barthelemy Chollet () and
Caroline Mothe ()
Additional contact information
Vincent Chauvet: IREGE - Institut de Recherche en Gestion et en Economie - USMB [Université de Savoie] [Université de Chambéry] - Université Savoie Mont Blanc
Barthelemy Chollet: EESC-GEM Grenoble Ecole de Management
Caroline Mothe: IREGE - Institut de Recherche en Gestion et en Economie - USMB [Université de Savoie] [Université de Chambéry] - Université Savoie Mont Blanc
Grenoble Ecole de Management (Post-Print) from HAL
Abstract:
Research has shown that NPD project leaders should engage in boundary-spanning activities. The present study tested the impact of four boundary-spanning activities on NPD project performance and analyzed the antecedents of these activities. We hypothesized that NPD project leaders' abilities to perform these activities depend on the characteristics of their personal networks -- structural holes, strength of ties, vertical and horizontal bridging ties. A Partial Least Squares test on 73 NPD projects showed that (a) "obtaining political support" and "scanning for ideas" are the boundary activities with the greatest impact on performance, (b) project leaders with strong ties in their network are more effective at these activities, (c) project leaders with structural holes in their networks are more effective in another boundary activity, "protecting the team", although this activity does not affect NPD outcomes. These results represent an important contribution to understanding how team leaders contribute to project performance.
Keywords: NPD performance; Personal network; Project leader; Team boundary spanning (search for similar items in EconPapers)
Date: 2012
Note: View the original document on HAL open archive server: https://hal.science/hal-00919228v2
References: View complete reference list from CitEc
Citations: View citations in EconPapers (8)
Published in International Journal of Project Management, 2012, 30 (6), pp.708-722. ⟨10.1016/j.ijproman.2012.01.001⟩
Downloads: (external link)
https://hal.science/hal-00919228v2/document (application/pdf)
Related works:
Working Paper: Project leaders as team boundary spanners: Relational antecedents and performance outcomes (2012) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:gemptp:hal-00919228
DOI: 10.1016/j.ijproman.2012.01.001
Access Statistics for this paper
More papers in Grenoble Ecole de Management (Post-Print) from HAL
Bibliographic data for series maintained by CCSD ().