Compromis temporels dans la gestion des projets. Le cas de la maintenance nucléaire

Tatjana Globokar
Additional contact information
Tatjana Globokar: CRG - Centre de recherche en gestion - X - École polytechnique - IP Paris - Institut Polytechnique de Paris - CNRS - Centre National de la Recherche Scientifique

Post-Print from HAL

Abstract: The example of an outage for the maintenance of a nuclear power plant considered as a project of a complex time construction enables to analyse the time factor through its multiple facets and to draw up a time matrix for such kind of project. Different aspects of time uncovered this way suggest that more attention should be paid to maintenance projects by concentrating on time components and their meaning that generally exist in any kind of project.

Keywords: high reliability organizations; organisations hautement fiables (search for similar items in EconPapers)
Date: 2004
References: Add references at CitEc
Citations:

Published in Revue Française de Gestion, 2004, 30 (152), pp.81-96

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-00278118

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-19
Handle: RePEc:hal:journl:hal-00278118