Advanced Planning and Scheduling system: An overview of gaps and potential sample solutions

France Anne Gruat-La-Forme, Valerie Botta-Genoulaz (), Jean-Pierre Campagne and Pierre-Alain Millet ()
Additional contact information
France Anne Gruat-La-Forme: LIESP - Laboratoire d'Informatique pour l'Entreprise et les Systèmes de Production - UL2 - Université Lumière - Lyon 2 - ECL - École Centrale de Lyon - Université de Lyon - UCBL - Université Claude Bernard Lyon 1 - Université de Lyon - INSA Lyon - Institut National des Sciences Appliquées de Lyon - Université de Lyon - INSA - Institut National des Sciences Appliquées
Valerie Botta-Genoulaz: LIESP - Laboratoire d'Informatique pour l'Entreprise et les Systèmes de Production - UL2 - Université Lumière - Lyon 2 - ECL - École Centrale de Lyon - Université de Lyon - UCBL - Université Claude Bernard Lyon 1 - Université de Lyon - INSA Lyon - Institut National des Sciences Appliquées de Lyon - Université de Lyon - INSA - Institut National des Sciences Appliquées
Jean-Pierre Campagne: LIESP - Laboratoire d'Informatique pour l'Entreprise et les Systèmes de Production - UL2 - Université Lumière - Lyon 2 - ECL - École Centrale de Lyon - Université de Lyon - UCBL - Université Claude Bernard Lyon 1 - Université de Lyon - INSA Lyon - Institut National des Sciences Appliquées de Lyon - Université de Lyon - INSA - Institut National des Sciences Appliquées
Pierre-Alain Millet: LIESP - Laboratoire d'Informatique pour l'Entreprise et les Systèmes de Production - UL2 - Université Lumière - Lyon 2 - ECL - École Centrale de Lyon - Université de Lyon - UCBL - Université Claude Bernard Lyon 1 - Université de Lyon - INSA Lyon - Institut National des Sciences Appliquées de Lyon - Université de Lyon - INSA - Institut National des Sciences Appliquées

Post-Print from HAL

Abstract: This paper intends to take up an overview of gaps existing in Advanced Planning Scheduling system (APS). Even if APS system provide a number of solution approaches for several practical problems (inventory and global costs reduction, customer service level increase, pertinent decision making), improvement ways still emerge. Firstly, we have led a functional analysis, to identify some gaps about supply chain management activities (financial aspect and Engineering To Order concept). Then, we made a literature review to identify works have been done in these areas. This review allowed us to outline a second kind of weakness liked to the functional range of some modules too (demand forecasting, proposition of lots sizing, reactivity). So, gaps and potential solutions proposed in the scientist literature, are presented in this paper. We conclude by underlining another type of problem, concerning the management needed to install correctly an APS system.

Keywords: Advanced Planning and Scheduling system; Supply Chain Management; APS gaps; functional analysis (search for similar items in EconPapers)
Date: 2005-05-16
Note: View the original document on HAL open archive server: https://hal.science/hal-00395107
References: View complete reference list from CitEc
Citations:

Published in International Conference on Industrial Engineering and Systems Management, May 2005, Marrakech, Morocco. pp.683-695

Downloads: (external link)
https://hal.science/hal-00395107/document (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-00395107

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-19
Handle: RePEc:hal:journl:hal-00395107