Accountability-based order fulfillment process reengineering towards supply chain management: A case study at a semiconductor equipment manufacturer
Linda Zhang,
J. Jiao and
Q. Ma
Post-Print from HAL
Date: 2010
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Published in Journal of Manufacturing Technology Management, 2010, 21 (4), pp.287-305
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-00798963
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().