EconPapers    
Economics at your fingertips  
 

Valuing Future Information Under Uncertainty Using Polynomial Chaos

Michael Prange, William J. Bailey, Benoît Couët, Hugues Djikpesse, Margaret Armstrong (), Alain Galli and David A Wilkinson ()
Additional contact information
Michael Prange: Schlumberger-Doll Research - Schlumberger-Doll Research
William J. Bailey: Schlumberger-Doll Research - Schlumberger-Doll Research
Benoît Couët: Schlumberger-Doll Research - Schlumberger-Doll Research
Hugues Djikpesse: Schlumberger-Doll Research - Schlumberger-Doll Research
Margaret Armstrong: CERNA i3 - Centre d'économie industrielle i3 - Mines Paris - PSL (École nationale supérieure des mines de Paris) - PSL - Université Paris Sciences et Lettres - I3 - Institut interdisciplinaire de l’innovation - CNRS - Centre National de la Recherche Scientifique
Alain Galli: CERNA i3 - Centre d'économie industrielle i3 - Mines Paris - PSL (École nationale supérieure des mines de Paris) - PSL - Université Paris Sciences et Lettres - I3 - Institut interdisciplinaire de l’innovation - CNRS - Centre National de la Recherche Scientifique
David A Wilkinson: Efficient Solutions Inc. - Efficient Solutions Inc.

Post-Print from HAL

Abstract: This paper estimates the value of information for highly uncertain projects whose decisions have long-term impacts. We present a mathematically consistent framework using decision trees, Bayesian updating, and Monte Carlo simulation to value future information today, even when that future information is imperfect. One drawback of Monte Carlo methods in multivariate cases is the large number of samples required, which may result in prohibitive run times when considerable computer time is required to obtain each sample, as it is in our example. A polynomial chaos approach suitable for black-box functions is used to reduce these computations to manageable proportions. To our knowledge, this is the first exposition of polynomial chaos in the valuation literature. In our example it provides a speed-up of more than two orders of magnitude. We demonstrate the approach with an oilfield example involving a future decision on where to place a new injection well relative to a fault. The example considers the value to the asset holder of a measurement, to be made in the future, that reveals the degree of reservoir compartmentalization caused by this fault. In conditions of high demand for rigs and other scarce capital-intensive oilfield equipment, it may be appropriate for the asset holder to agree to a forward contract for this critical measurement to be taken at a future date at some specified price. The service provider would be contractually bound to provide this measurement at this pre-agreed price within a specified time window, regardless of the prevailing price and availability of rigs and equipment. Despite the presence of financial uncertainty on future oil price and private uncertainty on reservoir variables that are largely unresolved by the measurement, our methodology provides a computationally efficient valuation framework, possibly leading to novel ways of setting up contract terms.

Keywords: uncertainty; valuation; decision trees; Monte Carlo; polynomial chaos; probability collocation method (search for similar items in EconPapers)
Date: 2008
References: Add references at CitEc
Citations: View citations in EconPapers (4)

Published in Decision Analysis, 2008, 5 (3), pp.140-156. ⟨10.1287/deca.1080.0120⟩

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-00842100

DOI: 10.1287/deca.1080.0120

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-19
Handle: RePEc:hal:journl:hal-00842100